A Playground Safety Flooring Upgrade Designed Around Fall Protection in Kent

Get in Touch

When we were contacted about upgrading a playground at a school in Kent, the conversation quickly moved beyond the condition of the existing surface. The client wanted to improve the play area's overall finish, but their main priority was making sure the replacement safety flooring was appropriate for the heights from which children could potentially fall.

This meant taking a performance-led approach to the project. Rather than simply replacing the existing rubber surfacing on a like-for-like basis, we worked through the requirements with the client to establish what the new installation needed to achieve and how the finished surface would work alongside the existing play equipment.

Starting with the Fall Height Requirements

During our initial discussions, the school explained that it wanted to make the playground a more dependable space for everyday use. The existing surfacing had begun to show signs of deterioration, and the team wanted to avoid investing in a replacement that looked better but did not adequately address the area's safety requirements.

We explained that the critical fall height of the relevant play equipment is a key consideration when specifying playground safety flooring. Equipment such as climbing frames, platforms and elevated play structures can require different levels of impact attenuation depending on their configuration and the height from which a child could fall.

The client was keen to understand how this would affect the proposed installation. We discussed the importance of checking the equipment's fall height information and matching it to a suitable surfacing system with appropriate test evidence.

BS EN 1177 provides the recognised test methods for assessing the impact attenuation performance of playground surfacing. However, compliance cannot be established simply by choosing a particular rubber thickness. The suitability of the complete system, its installation and the relevant fall height all need to be considered.

This helped us establish a clear starting point for the specification before progressing to the physical works.

Why the Existing Surface Needed Attention

As with many playground refurbishment projects, the condition of the existing surface was an important part of the planning process. A worn or damaged rubber surface can affect the appearance and usability of a play area, but visible deterioration can also indicate that closer inspection is needed.

We considered the areas requiring attention and the relationship between the existing surfacing, the play equipment and the surrounding ground levels. The condition of the underlying base was particularly important because even a suitable impact-absorbing material can experience problems if it is installed over an unstable or unsuitable foundation.

We discussed the options with the school, explaining that the final approach would depend on the condition of the existing construction. Where the base is suitable, it may be possible to install replacement surfacing without undertaking extensive groundworks. Where defects are present, additional preparation or reconstruction may be necessary.

This assessment helped us avoid treating the project as a straightforward cosmetic repair when the priority was to deliver a suitable safety surface.

Planning the New Flooring System

For the upgraded play area, we considered a wetpour rubber surfacing system as a practical option. Wetpour is formed by mixing rubber granules with a polyurethane binder and installing the material in layers to create a continuous surface.

A typical installation incorporates a resilient base layer and a coloured EPDM wearing course. The base layer contributes to the overall impact-absorbing performance, while the wearing course provides the finished appearance and a durable surface for everyday playground use.

The exact construction must be selected according to the performance requirements, the sub-base and the manufacturer's specifications. We therefore focused on ensuring the proposed system was appropriate for the identified fall heights, rather than assuming that one standard thickness would suit every section of the playground.

We also discussed the layout and perimeter details with the client. Neat transitions around equipment, paths and adjacent surfaces help create a more usable space and reduce the likelihood of poorly finished edges becoming a maintenance issue.

Delivering the Installation

Once the specification and preparation requirements had been agreed, we arranged the work in stages to minimise disruption to the school's normal activities.

The first stage involved preparing the designated area. This included checking the installation levels, dealing with any necessary preparation of the base and ensuring the surface was suitable for receiving the new material. Any loose or unsuitable material would need to be addressed before installation could proceed.

With the base ready, the wetpour could be mixed and laid in accordance with the specified system. Consistent material mixing, even placement and careful compaction are essential to achieving the required thickness and a uniform finish. Particular care was needed around the play equipment and perimeter details, where awkward shapes can make maintaining consistent levels more challenging.

The installation itself required suitable weather conditions. Wetpour materials rely on polyurethane binder chemistry, so moisture and temperature can affect installation quality and curing. We planned the works around the available site conditions rather than rushing the process at the expense of the finished result.

For a relatively small playground refurbishment, the installation might take approximately two to four working days, depending on the area size, preparation requirements and complexity of the layout. Additional time must also be allowed for the material to cure before the playground is reopened. The actual programme for this type of project is always dependent on the agreed scope and site conditions.

Checking the Finished Surface

Once the new flooring had been installed, the focus shifted to checking the quality of the finished work. We reviewed the surface for consistency, paying attention to the installed levels, the perimeter finish and the areas surrounding the play equipment.

It was important that the completed installation reflected the agreed specification. Where impact attenuation is required, the selected system must have suitable supporting test evidence for the intended application. If the project requires on-site testing or other verification, this should be arranged as part of the agreed compliance process rather than assumed to have been completed through visual inspection alone.

We also highlighted the importance of ongoing maintenance. Regular inspections can identify damage, worn areas, loose granules or deteriorating edges, allowing the school to investigate issues before they become more extensive.

A More Considered Approach to Playground Safety

The Kent project demonstrates why playground safety flooring should be specified around the requirements of the equipment and the children using the space, rather than thickness or appearance alone.

By discussing the fall protection requirements at the outset, considering the condition of the existing base and selecting a suitable surfacing system, we could approach the upgrade with the performance of the finished playground in mind.

We undertake playground surfacing and refurbishment projects for schools, nurseries, councils and other organisations across the UK. If your existing safety flooring is deteriorating or you are planning a new play area, our team can help you assess the installation requirements and identify an appropriate solution.

Contact us to discuss your playground project and find out how we can help deliver a durable, carefully specified safety surfacing installation.